General data

  • Location: Pecém Industrial and Port Complex (CIPP) - São Gonçalo do Amarante (CE)
  • Installed Capacity: 720 MW
  • Operation Start: December of 2012
  • Concession Term: 15 years
  • Name: Pecém TPP
  • Owning company: EDP

Technical data 1

  • Coal powder: 24 front burners + 24 Diesel burners for Starting.
  • Forced circulation
  • Capacity: 1188T/h BMCR (1134T/h - RO)
  • Performance: 89.51%
  • Manufacturer: Doosan Babcok

Turbo Generator Group

  • Two-body turbine, tandem compound type, double exhaust with reheated steam condensation and 8 extractions.
  • Hydrogen- and water-cooled alternator.
  • Thyristor static excitation
  • Steam inlet conditions: Saturated, 168.7 kg/cm²g, 537°C
  • Generation voltage: 19000V
  • Apparent power of the group: 360MW
  • Manufacturer: Siemens