UTE Pecém | EDP Brasil
General data
- Location: Pecém Industrial and Port Complex (CIPP) - São Gonçalo do Amarante (CE)
- Installed Capacity: 720 MW
- Operation Start: December of 2012
- Concession Term: 15 years
- Name: Pecém TPP
- Owning company: EDP
Technical data 1
- Coal powder: 24 front burners + 24 Diesel burners for Starting.
- Forced circulation
- Capacity: 1188T/h BMCR (1134T/h - RO)
- Performance: 89.51%
- Manufacturer: Doosan Babcok
Turbo Generator Group
- Two-body turbine, tandem compound type, double exhaust with reheated steam condensation and 8 extractions.
- Hydrogen- and water-cooled alternator.
- Thyristor static excitation
- Steam inlet conditions: Saturated, 168.7 kg/cm²g, 537°C
- Generation voltage: 19000V
- Apparent power of the group: 360MW
- Manufacturer: Siemens
learn more about
Porto do Pecém TPP